Mobile

Medical Accomodation

  • Adaptability when positioning at various hospitals.
  • No building regulations applicable with licenses.
  • Transport without a special license.
  • Simple resell process of the unit once the business case is completed.
  • Fewer expenses when parking the trailer at the hospital.
  • Use of stairs and lift is necessary.
  • Smaller than average MRI room.
View Mobile cases

Hybrid

Medical Accomodation

  • Fire rating is possible.
  • Connection to hospitals is possible.
  • (Patients do not have the experience of being in a mobile MRI Solution.)
  • Increased convenience for staff and patients as a result of the additional space.
  • Possible to walk around the MRI.
  • Positioning is accessible without the use of a crane.
  • Potential license needed to transport.
View Hybrid cases

Relocatable

Medical Accomodation

  • Fire rating is possible.
  • Connection to hospitals is possible.
  • (Patients do not have the experience of being in a mobile MRI Solution.)
  • Increased convenience for staff and patients as a result of the additional space.
  • Possible to walk around the MRI.
  • Possible for 1.5T and 3T MRI systems.
  • Building regulations are applicable.
  • More cost to transport.
  • License needed to transport.
  • Additional space required at the hospital
  • Foundation is preferred / cost to locate the relocatable.
  • Cranage is necessary when positioning the relocatable on site.
View Relocatable cases

Innovative Medical
Accommodations that
make the difference.

All our units consist of:

Sandwich panel technology

Closed-cell foam that is often used in the aerospace industry that does not absorb water

No corrosion, which reduces the need for refurbishment over time.

One seamless panel consisting of up to 14 layers of materials, including shielding

High-quality performance in extreme weather conditions, between -35°C up to +45°C.

Arctic package available upon request

The highest insulation value of 0,375K

A variety of fire-resistant options are available

Innovative engineering

For improved patient comfort

Sealed from water entrainment and corrosion

For service intervals reduction

To extend product life

To Reduce transportation, operating, and service costs

Seamless construction

Excellent imaging accuracy as there is no movement of the walls when exposed to heat/cold

Stronger and lighter than other conventional (metal) constructions

Higher insulation than conventional (metal) constructions

Easy to clean

Fresh appearance

Quality standard

Warranty of 60 months on the Medical Panel Construction

ISO 9001:2015 certified

Life cycle of at least 15 years

Highest standard in Health & Safety

Project management
from A to Z for optimal delivery.

Benefit from our on-time execution through our process management.

Project management is the key to success for on-time delivery. That is why we believe it is essential to inform the clients and provide complete transparency of the buildup timeline to manage all expectations. Once the accommodation structure and design are finalised, the building process will immediately begin at one of our factories. Throughout this process, we will virtually invite you to watch the design buildup in real-time.

We promise to maintain and manage the new Medical Accommodation until the unit is delivered directly to you, after which we will be happy to answer any queries you might have and provide additional maintenance assistance.

Extending unit performances
for at least 15+15 years.

Enjoy the Buyback service for all newly delivered units.

As part of the Lamboo Medical CO2-Neutral Programme, our team has initiated a buyback service for all newly delivered units. The Lamboo units are updated to accommodate new Medical equipment after 15 years. The programme 15 + 15 years shows the quality of the build but, more importantly, saves the environment as 80% of CO2 emitted results from building new industrial products globally. The buyback programme consists of high-quality units and a professional refurbishment team. This ensures that Lamboo Medical units receive the 2nd life without the unnecessary dismantling of materials.